Plastics sorting line
Lombardy • 2024
6 t/h shredding and separation plant with optical quality control and integrated dust management.
+28% recovery yield
Projects
A selection of industrial and environmental installations, with results measured in the field.
Lombardy • 2024
6 t/h shredding and separation plant with optical quality control and integrated dust management.
+28% recovery yield
Emilia-Romagna • 2023
Chemical-physical treatment with process water reuse and automated sludge dewatering.
-40% water consumption
Veneto • 2023
Panel upgrades, new drives, SCADA supervision and machine safety compliance.
-22% plant downtime
Piedmont • 2022
Heat exchangers and recovery circuit from the furnaces to preheat combustion air.
-31% gas consumption
Tuscany • 2022
Local extraction, bag filters and scrubbers to comply with permitted emission limits.
100% limits met
Friuli-Venezia Giulia • 2021
Full design and supply of a materials treatment line with integrated logistics.
Start-up in 7 months
Share your goals and constraints: we'll prepare a dedicated technical proposal.